Thursday, September 27, 2007
Chimney and trim
Ell and porch
Thursday, September 6, 2007
Dormers
2nd floor framing
Walls of first floor
Outdoor living
First floor framing
Here you can see the framework for the first floor. You can see the square opening in the center of the top picture, this is where the chimney will be. The bottom picture shows the sunken family room. The crew used blocking which is a higher quality way to support the floor, preventing creaking and warping.
Then they put Advantech or OSB (Orientated Strand Board) down. This is a form of plywood that uses minimal chemicals compared to regular plywood. We are trying to be somewhat "green" with our new home. Although, our friends Meghan and Dave have far surpassed us. Check out their blog and building project at http://19ridgeroad.blogspot.com/ It is awesome.
Our goal (really my goal) is to have no mold, and that is why I really wanted all wood framing like they would have done 100 years ago, but no one else agreed. In my reading heartwood is the best to use to prevent mold. But our builder guarantees our house is going to be so well built that we will not have to worry about mold. We shall see!
Wednesday, July 4, 2007
Framing begins..........
Finishing the slab...
Wednesday, June 20, 2007
Drainage, Radon Mitiagtion & Backfilling
We have installed exterior and interior drainage lines in and around the foundation. The interior drain will also serve as a radon vent, mitigating and venting radon gas up and out of our future home. You can see the interior drain exiting out through our footing. The hole above the footing will house the sewer line.
Foundation Walls up and Prepaired.....
Harrison, Mike and Mickey Hoyt arrived with the forms late in the day, and quickly set the far wall. The next day, an hour before they finished setting the forms they called for the concrete. These guys do not miss a beat. Our walls are only 4' tall. We will only have a crawl space under the house due to the high water table and the fact that...well...we have a barn to keep our "stuff" in already.

Two holes.....one shower
Subscribe to: